Headline • After the UAE, Russia will now give PM Modi the highest civilian honor• India again surprised the world by testing the weapons of space• 17 years later, China felt a big blow economic situation is very weak• Supreme Court gives relief to cricketer Sreesanth in spot-fixing• Aamir Khan gave statement on Kangana Ranaut's resentment• No change in government stand on Article 35A• SP-BSP alliance in Madhya Pradesh and Uttarakhand• Arjun Kapoor and Abhishek Bachchan praise Akshay Kumar's trailer for the film Kesari• BJP government raises EPF interest rates• Uttarakhand Police urges Kashmiri students not to send inflammatory statements on social media• Kulbhushan Jadhav case starts hearing on Monday• Rajiv Saxena gets interim bail till Feb 22 • Vadra wrote on Facebook, handed Priyanka to the people of India, please keep them safe.• J&K : Attack on CRPF team, 7 security personnel and 4 civilians injured• State strike in Uttar Pradesh is illegal: Allahabad High Court• Mamata Banerjee declares victory on Supreme Court order in West Bengal• Tension in Meerut area after breaking Ambedkar statue• INDvsNZ : India won the series 4-1• I will leave politics even after Modi's retirement : Smriti Irani• Don Ravi Pujari arrested from African country Senegal• "I will be back soon" Union Minister Arun Jaitley• Report of the NSSO's unemployment, at the high level of 45 years• Modi government can give big gift to farmers• Akhilesh welcomes Priyanka Gandhi's political entry• Republic Day 2019 : India's power demonstration on Rajpath

Cabinet approves revival of Barauni, Gorakhpur fertilizer units

The Union Cabinet chaired by the Prime Minister, Shri Narendra Modi, gave its approval for the revival of the closed unit of the Barauni of the Hindustan Fertilizer Corporation (HFCL) and Gorakhpur Fertilizer Unit of Fertilizers Corporation India.

These units were lying defunct and were not in operation since 2004. Therefore, the units and other facilities were lying unutilized. It is important to mention here that there is no indigenous urea units in the Eastern part of the country except a small unit at Namrup - Assam. There has been no Greenfield or Brownfield urea unit in last 19 years. The total requirement of urea in the country is around 300 Lakh MetricTonne (LMT) out of which 220-230 LMT of urea is produced annually from the indigenous urea units and balance is being met from the international market at Western and Eastern Ports. The demand of urea of the Eastern region, at present is being met either from the Western ports or from the units located in Western and Central India involving long distance transportation. Long distance transportation of urea riddled with high expenditure in terms of high freight subsidy as well as logistics problems. The revival of these units will ensure timely availability of urea from these units to the eastern region. Apart from growth of the regional economy of the country, each unit will be revived through bidding route with an approximate investment of Rs. 5000 - 6000 crore, and create employment opportunity for 500 direct and 2500 indirect workers.

This decision along with the CCEA's decision today on gas pooling for the urea sector will enable these units to get gas at pooled price on their revival, making them globally competitive.

Related News

:
:
: